Midland Titans Fan Club
Main Menu
  • About Us
    • Mission, Vision and Values
    • Program Pricing
      • Our Sponsors
    • FAQ’s
    • Media Submission
    • Privacy Policy
  • Our Facility
  • Team
    • Rosters
    • Coaching Staff
    • Schedule
      • Tournaments
      • GameChanger
      • USSSA Team Pages
  • Resources
    • Player Login
      • Titans Playbook
    • Facebook
    • Certificates of Insurance
  • Team Store

Titan Facilities


74′ x 40′ Indoor Space

Setup as three full size tunnels. Can be combined into one large workout space.

  • Iron Mike Machine
  • Hack Attack Machine
  • x3 Soft Toss Nets
  • Pocket Radar
  • Rapsodo 3.0 (Ball Flight)

60′ x 30′ Outdoor Tunnel Space

Two 60′ x 15′ Hitting Tunnels

  • Hack Attack Machines
  • Durable Rubber Backstops
  • Portable Mounds
  • L-Screens
  • Outdoor Lighting

Outdoor Double Bullpen

Concrete base and college-size Regulation

  • 10u through college level distances
  • Concrete Base – turf coming soon!
  • Backstop Netting – brick and padding coming soon!
  • Pocket Radar
  • Rapsodo 3.0 (Ball Flight)
  • Outdoor Lighting

Strength and Conditioning

Coming Soon!

Help us with our new Gym buildout by visiting our Sponsorship page.


Classroom

Coming Soon!


Acreage to Build!

Blue Sky potentials with a vision for the future generations of student athletes.

Category

  • No categories

Archives

  • About Us
  • Meet the Titans
  • Mission, Vision and Values
  • Shop
Copyright © 2023 Midland Titans Baseball Club.